Specifications include, but are not limited to: 3.3.1 Provide all labor, equipment, tools, fuel, insurance, supervision, disposal costs and materials (except water), to clean up the streets in accordance with specifications contained in this document. 3.3.2 Clean up the Track Out by mechanical means of equipment necessary – (vacuum trucks, street sweepers, brooms, personnel, roll on/roll off trucks, and other various equipment needed) on all residential public streets, commercial public streets and all the paved public alleys in the City, as supported by the Water Services Department. 3.3.3 Clean up of the Track Out is based on a as needed service. The Contractor will be responsible for all clean-up of breaks which might include multiple breaks within a single day. The Contractor’s time could be between 2 to 6 hours on a typical clean-up, however in extreme cases the clean up could take several days.