Specifications include, but are not limited to: The work consists of the furnishing of all labor, equipment, and material for exterior painting of the Blaine House. The work includes the entire house exterior excluding window sashes and door leaves. The Contractor must be knowledgeable of historic building restoration and preservation. The building is occupied and fully operational. Contractor must coordinate construction schedule/painting sequence with Blaine House representative to minimize disruptions to visitors and impacts to House operations and events. Work activities may need to be delayed and/or halted for an event at the Blaine House. The work site must always have a neat appearance and be in a safe condition for the public who may be visiting the House. Any interference to the public by noise, air quality including odors, and obstruction of public egress is prohibited.