Specifications include, but are not limited to: All work under this contract will be governed by the CCWA Standards for Water Distribution Systems, all applicable AWWA Standards, and United States, State of Georgia, and local laws/regulations. The contractor shall be responsible for complying with the Underground Protection Act, and will be responsible for notifying the Utilities Protection Center (UPC) of work proposed according to the Georgia Underground Facilities Protection Act. All locate requests to the UPC shall be completed through Web Entry. Any damage to other utilities will be the responsibility of the Contractor. The work shall be performed under the direction of the Distribution and Conveyance Director of the Clayton County Water Authority or their representative. The work to be performed under this contract will be determined and assigned by CCWA on an “as-needed”, “when-needed” basis. CCWA does not guarantee any minimum or maximum work quantities under this contract, and reserves the right to bid any similar type work of this contract as a separate procurement at its sole discretion. The work to be performed under this contract will be issued in the form of a Project Work Order. A Project Work Order may include a single work item or may include a number of work items. All work items of a Project Work Order do not necessarily have to be adjacent to each other; however, it is the intent that each Project Work Order will be authorized as a part of a mobilization to a common geographic location