Specifications include, but are not limited to: All correspondence must be made through the Vendor Portal. a. Install six (6’) foot wide by six hundred ninety six (696’) foot long, five (5”) inch thick of new sidewalk through park with loop on north side as seen on map. b. Install six (6’) foot wide by thirty-five (35’) foot long, five (5”) inch thick of new sidewalk as a spur from main walkway to the basketball court as seen on map. SHAWNEE COUNTY REQUEST FOR PROPOSAL (RFP) c. Make one (1) curb cut and install ADA ramp on the southwest end of the main sidewalk/trail connecting to parking lot. d. Veteran’s Add Alternate #1: Install six (6’) foot wide by two hundred forty-five (245’) foot long, five (5”) inch thick of new sidewalk on west side of Kansas Ave bridge and parking lot including one (1) additional ADA ramp. See map below. e. Veteran’s Add Alternate #2: Install six (6’) foot wide by forty-five (45’) foot on the northeast portion of the Veteran’s Park loop to Quincy Street with one (1) ADA ramp exiting onto Quincy Street. f. Veteran’s Add Alternate #3: Install six (6’) foot wide by fifty-seven (57’) foot long winding walkway from Laurent Street toward flag poles, west around the NOTO Christmas tree, and out to alley entrance.