Specifications include, but are not limited to: • Traffic Control: Barriers, lane closures, flaggers, etc. SCDOT restrictions will apply to the S.Church St. (HWY.221) work and will include but not be limited to weekdays, night work only (6:00 pm – 7:00 am). Final requirements will be determined upon final SCDOT approval and will be provided as soon as available. • Backfilling: Covering trenches and holes after work is completed. • Surface Restoration: Repairing roads, sidewalks, landscaping, and other surface areas affected by the work. • Connections: Integrating new utilities with existing systems. • Testing: As required by Spartanburg Sanitary Sewer District (SSSD) • Abandoned Pipe: Existing pipe within public ROW will be removed. Existing pipe traversing City and private property will be left in place and filled with flowable fill as determined on design drawings.