The scope of work includes replacing existing water lines in the City of Verona. Estimated quantities of pipe are as follows: 1832 LF of 6” PVC, 1495 LF of 4” PVC, & 20 LF of 2” PVC. Other items of work include the usual appurtenances for borings, taps, meter reconnections, fire hydrants, valves, fittings and surface reconstruction. The scope of work includes replacing existing sewer lines in the City of Verona. Estimated quantities of pipe are as follows: 3770 LF of 8” PVC, 821 LF of 8” DIP, 2555 LF of 10” PVC, 616 LF of 10” DIP and 431 LF of 12” DIP. Other items of work include the usual appurtenances for manhole replacement, sewer line abandonment, service reconnections, bores, bypass pumping and surface reconstruction. The scope of work includes replacing an existing pump station in the City of Verona. Items of work include the usual appurtenances for a pump station replacement, electrical work, control panel replacement and other related construction activities.