Specifications include, but are not limited to: These specifications shall outline the scope of work required for removal and replacement of Upper Level Concrete Sidewalks, as highlighted on attached Exhibit 1. • The Convention Center will remain open during work. Bidder shall provide appropriate work zone signage and traffic control so that pedestrians can safely navigate to Convention Center entrances during work. • All specified work shall be completed in two (2) consecutive phases to allow for either the porte-cochere door or door near fountain to be accessible at any one time. • Protect all windows during construction. • Remove existing brick pavers, palletize for re-use, and re-install after concrete pavement work is completed. • Protect existing bollards. Removal & replacement is excluded from Base Bid. • Move existing site furnishings out of the work zone. Replacement of furniture at conclusion of work will be performed by Convention Center staff