Specifications include, but are not limited to: A. General: The intent of this project is to remove roughly 2400 sq ft of existing pavement and replace with roughly1200 sq ft of new 6’ wide concrete pathway, Contractor is responsible for field verifying. The existing water fountain will be removed and capped by Park District crews. B. Schedule: Work must be completed by Friday, September 20, 2024, and all paperwork, including pay applications and IDOL certified payroll must be submitted no later than Friday, October 11, 2024. C. Materials: a. Concrete: 4,000 mix, fiber reinforced Portland Cement concrete. b. Aggregate base: IDOT designation compacted CA-6 base under sidewalk. D. Execution: a. Verify all dimensions, measurements and necessary materials before quoting. b. Call JULIE before you dig! c. Notify Owner one week in advance of proposed work date. d. Limit access routes of vehicles to minimize compaction on tree roots in the area. Basketball courts and splashpad may not be used for staging. e. All walkways must comply with ADA standards for sidewalks and cross slopes. f. New sidewalk shall be tied into existing walkways with #3 x10” rebar, 18” O.C. g. Place concrete only on compacted aggregate base. Pour and finish concrete sidewalk according to IDOT standards. h. Construction joints shall be saw cut or troweled every 5’. Joint filler shall be used at all construction joints, expansion joints, and where tying into existing adjacent pavement. i. Provide fencing and/or security to prevent vandalism. Any vandalized concrete shall be repaired or replaced at the Owner’s discretion. j. Backfill all disturbed areas with topsoil. Seed and straw.