Specifications include, but are not limited to: 1 1ST FLOOR, BASEMENT, PORCH-ACCESSIBLE and/or GARAGE WINDOW State the cost for labor and materials to board-up each first floor, basement, porch-accessible and/or garage window. 2 2ND FLOOR WINDOW State the cost for labor and materials to board-up each second floor window. 3 ENTRY DOOR (Chip‐it Door) State the cost for labor and materials to board-up each entry door (Chip-it door). 4 DOOR COVER State the cost for labor and materials for each door cover. 5 "2x4" REINFORCEMENT State the cost for labor and materials for each “2x4” reinforcement added to the OSB board(s) for either a door or window. 6 GARAGE DOOR State the cost for labor and materials to board-up each single car garage door (Not the side service door). A two car garage would be billed at 2 times this rate. 7 SIX INCH SAFETY HASP LOCK State the cost for labor and materials to install a hasp lock.