Specifications include, but are not limited to: he project involves construction of a new building/buildings to house two out of the four MWW divisions. The approximate sizes and purpose for the spaces are listed below. Note that this is a preliminary list and may be changed to suit the MWW needs as the project progresses. 1) 20,000 SF Office Space 2) 3,000 SF Vehicle Service Bay 3) 19,000 SF Enclosed Parking 4) 7,500 SF Additional Storage ; The campus at 1581 Lake Shore Road currently houses the Lake Massabesic Water Treatment Plant and Raw Water Pump Station, as well numerous other buildings as shown on Figure 1. The expectation is that the area outlined in red on Figure 1 (8+/- acres) is where the new facility will be constructed. Work to be completed by the selected firm includes, but is not limited to, the following: 1) Existing conditions and topographic survey 2) Wetland Delineation 3) Subsurface Investigations 4) Permitting 5) Site and Building Design Drawings and Specifications 6) Bidding Services 7) Professional Services During Construction