Specifications include, but are not limited to: The Base Bid for the Town of Andrews Drainage Improvements - Phase 2 plans include clearing and grubbing, storm drain system installation, utilities, grading, and paving. The drainage improvements involve demolishing portions of the existing drainage system and constructing a new larger conveyance system. The proposed drainage system will begin with the primary outfall ditch North of I-521 Bypass. The existing drainage ditch will be filled and portions piped for connection to the proposed ditch. From Myrtle Road, new drainage pipes will be installed to Pine St. The project also includes roadway and concrete driveway replacement, a gravel access road, water main relocation, sewer force main relocation, underground gas main relocation, and telecom relocation.