Specifications include, but are not limited to: furnishing all labor, materials, tools, equipment, means of transportation, and incidentals necessary to perform the services. Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel. The Contractor must make a good faith effort to furnish the Department the fully operational equipment needed to perform Concrete and Portland Cement Concrete (PCC) Pavement Rehabilitation Services at such time, and at such location(s) as directed by the Engineer. Prior to start of work, Contractor must inspect equipment to ensure the equipment is fully operational for the performance of its intended purpose. The Contractor will also be responsible for any traffic control, licenses, and permits required to satisfy the duties required herein. When replacing PCC Slabs, the contractor is not allowed to remove the existing slab without being able to puor concrete within seven (7) calendar days of opening the road surface.