Specifications include, but are not limited to: The project consists of procurement and installation of four new electric generators. To install each generator, the proper fencing concrete pad, automatic generator transfer switch, propane/natural gas service line extension, and updates to the electrical panels to ensure proper operation of the generators, security of the system infrastructure, and ensure the safe operation of the systems during catastrophic events. Each generator shall come with a 10-year Generac Factory Warranty and are expected to have a useful life of 20 years. 1. 60 KW Generator at City Hall: Fueled Natural Gas Service Line located at 100 E Windsor Street, Westminster, SC 29693. 2. 60 KW Generator at the Maintenance Shop: Fueled Natural Gas Service Line located at 528 S Bibb St, Westminster, SC 29693. 3. 80 KW Generator at the North Avenue Booster Station: Fueled by a 1000-gallon Propane Tank, located at 311 W North Avenue. 4. 80 KW Generator at the US Highway 76 Booster Station: Fueled by a 1000-gallon Propane Tank, located at 10310-10398 Long Creek Highway...