Specifications include, but are not limited to: Contractor will provide all labor, materials, equipment, traffic control and incidentals necessary to remove current inlaid 3M tape pavement markings. Removal of the current pavement markings, cleaning of the roadway surface, preparation of the roadway surface and application of the new Epoxy pavement markings will be in accordance with the manufacturer’s recommendations and in accordance to MUTCD. Contractor will provide all labor, materials, equipment, traffic control and incidentals necessary to apply epoxy pavement markings per contract information. Work will include 4,000 SQ FT of Crosswalk and Stop Bars, and 4100 SQ FT consisting of (86- Single Arrows), (6- Double Arrows), (95- ONLY), (3-Bicycle), (6-Bicycle Arrows). Contractor shall replace the existing stripes and symbols in kind unless otherwise directed by the Maintenance Chief.