Specifications include, but are not limited to: rehabilitation of Bridges 1-719, 1-720, 1-738 and 1-739. The scope of work for each bridge varies slightly, but in general includes: replacing the existing deck overlay with a new concrete overlay, replacement of deck joints, and replacement of the approach slabs. Bridges 1-719 and 1-720 will receive minor substructure repairs and a refresh of the paint coating on the steel beams. Lighting will be added along the I-95 corridor from Churchman's crossing to the 295 split. Construction work will be performed in multiple phases to maintain vehicular traffic through the corridor. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer.