Specifications include, but are not limited to: STOCKPILE SITE #1: GOAT CREEK STOCKPILE SITE ROUTE: MT-83 MILEPOST: 58.85 MMS STOCKPILE NUMBER: 111223 SPECIFICATIONS FOR WORK: Provide all labor, materials, equipment and incidentals necessary to produce 2,250 tons or 1,500 cubic yards of sanding material. Stockpile material to facilitate water runoff. STOCKPILE SITE #2: FERNDALE SHOP ROUTE: MT-83 MILEPOST: 80.6 MMS STOCKPILE NUMBER: 011224 SPECIFICATIONS FOR WORK: Provide all labor, materials, equipment and incidentals necessary to produce 3,000 tons or 2,000 cubic yards of sanding material. Stockpile material to facilitate water runoff. STOCKPILE SITE # 3: BIG FORK STOCKPILE SITE ROUTE: MT-35 MILEPOST: 35.03 MMS STOCKPILE NUMBER: 0111246 SPECIFICATIONS FOR WORK: Provide all labor, materials, equipment and incidentals necessary to produce 1,500 tons or 1,000 cubic yards of sanding material. Stockpile material to facilitate water runoff.