Specifications include, but are not limited to: • Excavation of 663 CY of native material for the playground, pedestrian paths, the parking pad and adjacent landscape. • Backfill with 132 tons of type II classified fill. • Backfill with 65 tons of type III classified fill. • Backfill with 28 tons of leveling course. • Remove 19 CY of gravel path. • Reconstruct 1 approach. • Pave parking pad with 7 tons of asphalt. • Install 23 tons of asphalt sidewalk. • Install 214 SY of woven geotextile fabric in the playground. • Furnish and install 1 handicapped parking sign. • Furnish and install seeding (4 MSF) • Furnish and install topsoil (4 MSF) • Furnish and install playground timber curb (233 LF). • Furnish and install 7 vertical round posts. • Remove and relocate 2 bollards. • Furnish and install 24 CY of class 1 rip rap.