Specifications include, but are not limited to: 1. MOBILIZATION A. Measurement will be lump sum complete. Payment shall be: 1. 50% at first pay estimate; and 2. 50% at final pay estimate B. Payment covers cost of mobilization, installation of all temporary facilities and bringing all necessary construction equipment to the site. Upon completion of the Work any unpaid amount of the original contract for the separate item of mobilization and temporary facilities will be paid. Also includes: any and all temporary facilities including but is not limited to water, power, fencing (permanent or temporary), fence removal as required, solid waste disposal, sanitation facilities, and any other temporary facilities or utilities, etc., and all other items not covered in other bid items. Mobilization price should not exceed 5% of the total cost for this Bid. C. Bid price includes cost of all permits not included in Item 2 of this document. 2. TRAFFIC CONTROL A. Measurement shall be lump sum complete. Payment shall be: 1. 25% at first pay estimate; 2. Remaining portion of bid item paid as percentage of the contract completed with each subsequent estimate. B. Bid price includes cost of creating a traffic control plan in accordance with the MUTCD, most current version, acceptable to the City Engineer, to provide a safe work zone including all vehicular, bicyclists, and pedestrian traffic. The contractor shall provide traffic control for this project. C. Bid price includes cost of Logan City Work in the Right of Way Permit (no fee). D. Reference General and Specific notes for Access requirements to property owners, tenants, and businesses. E. Access must be maintained for emergency vehicles throughout the project