The City of Peoria (City) is seeking a qualified heavy civil roadway and drainage CMAR to provide construction services for four separate Capital Improvement (CIP) Projects. All four of the projects are included in this solicitation and would be awarded together under a phased project approach with the initial phase of the award being pre-construction services followed potentially by multiple Guaranteed Maximum Price (GMP) contracts. The project Scope of Work is for Construction of a 4-lane or 6-lane arterial parkway (will depend on traffic analysis recommendation) from Loop 303 to SR74 that will include but not limited to: curb, gutter, sidewalk, signage, striping, bike lanes, streetlights, catch basins, scuppers, landscape, landscape irrigation in accordance with City Standards. (Exhibit A) • Wide raised medians with landscaping from Loop 303 to SR74 (Exhibit A) • Potential intersection improvements at major crossroads that may include: Dixileta Drive, Ashler Hills Road (located between the north ramp terminals of the SR303L), Dove Valley Road, Old Carefree Highway, and SR 74. • Traffic signals and/or modifications to existing traffic signals at major crossroads. • Interconnect conduit and fiber from Loop 303 and SR74 • Storm drainage improvements may include but not limited to: large box culverts and/or pipelines, multiple retention basins, spillways, headwalls, catch basins, energy dissipators, manholes, channels and drywells • ~24-Inch waterline installation from Loop 303 - to SR74 (UT00527) • ~18-inch sewer installation from Loop 303 - to SR74 (UT00528) • ~24-Inch reclaimed waterline from Loop 303 to SR74 (UT00529) • Undergrounding existing APS 12kV overhead powerlines along the east side of Lake Pleasant Parkway • Joint trench for City & private communication utilities from Loop 303 to SR74 • New bridge structure, at-grade or elevated, located at the CAP • Retaining walls in and around the new CAP bridge structure