The Vendor will conduct monthly Fire Pump System inspection and testing to ensure compliance with Unified Facilities Criteria (UFC) Operations and Maintenance: inspection, testing, and maintenance of Fire Protection Systems 3-601-02. System consists of one pump house, one electric pump and one diesel pump. Perform monthly ITM tasks as outlined in Table 2-7. 1.2.2. Pump House: Inspect for proper condition, ventilation, and heating. 1.2.3. Control Valves and Isolation Valves: Verify proper valve position. 1.2.4. Pressure Gauges: Check readings and verify gauge operability. 1.2.5. Controllers: Verify that automatic controllers are in the automatic (AUTO) setting, inspect electric connections, and operate manual and automatic stations. 1.2.6. Batteries: Verify proper charge. 1.2.7. Pumps: 1.2.7.1. Start and churn to verify operability. (Where equipment permits, allow water to flow back to the source.) Electric pumps shall operate for 10 minutes, and engine-driven pumps shall operate for 30 minutes. 1.2.7.2. Verify operation of relief valves. 1.2.7.3. Verify full level (for engine-driven pumps). 1.2.7.4. Inspect exhaust system for leaks (for engine-driven pumps). 1.2.7.5. For engine-driven pumps: start again using second battery set and churn to verify operability. (Where equipment permits, allow water to flow back to the source). 1.2.8. Provide an estimate for all discrepancies needing repairs to 182nd CES Point of Contact (POC). 1.2.9. Provide documentation of completed ITM tasks to POC.