Preliminary Design: • Comprehensive engineering study including, but not limited to: o Topographic survey, ROW research and base plan development o Hydrologic and hydraulic analyses o Bridge Engineering o Roadway Engineering • Identification of environmental and cultural resources • Comprehensive environmental and historical assessment • Development of an environmental document • Comprehensive Benefit-Cost Analysis (BCA) meeting FEMA requirements • Final Report Preparation • Cost estimation and preliminary scope of work for selected alternative • Conceptual plan development • Assistance with a FEMA grant application and grant management support Final Design: • Final Bridge design • Final Roadway design • Traffic analysis • Final construction plan, estimate, specifications and contract document development • Assistance with permitting submission and closeout • Assistance with development of environmental and historic preservation (EHP) documentation and permitting • ROW acquisition, if needed • Utility coordination • Bid assistance Construction Engineering/Administration Services • On-site construction observation • Contract administration • Grant management • Review of pay requests • Review of RFIs • Shop drawing review • Final project closeout