Specifications include, but are not limited to: The Work consists of installation of a new pumping station at City Utilities’ Southeast Tower site as shown on the project plans and specifications. Construction includes, but not limited to, furnish and install two horizontal split case centrifugal pumps, VFDs, generator, pressure relief valve, controls, electrical, valving, piping and all appurtenances required to provide a complete and operational pumping station. Contractor shall conduct startup procedures for the completed pump station and generator. Pump station building to be a complete finished structure with HVAC, mechanical, electrical and all related appurtenances. Site improvements include grading, buried conduit, concrete foundations, electrical improvements, valving and piping, including construction of a 24-inch water main to connect from the pump station to an existing water main adjacent to Hwy 60 near the project entrance. Only 2 pumps and VFD’s will be supplied under the contract/project. The contractor shall provide a sleeve to fit in place of the remaining 2 pump slots.