Specifications include, but are not limited to: Work items include but may not be limited to: • Contractor shall clear and grub the site as shown in the Civil Plan Sheets in preparation for parking lot, playground and modular building site grading in accordance with the attached Geotechnical Report from GRI (Exhibit I). • GRI will be contracted separate from this solicitation for soil observations to ensure the over excavation of the undocumented fill down to component subgrade for the building, parking lot and playground are achieved and/or moisture conditioned and compacted firm. • As described in the geotechnical report, the current over excavation quantity of undocumented/unconsolidated fill below rough site grading is estimated at about 4000 CY for the building, parking lot and playground areas but could far exceed that estimate. The site contractor is at risk for the quantity of over excavation needed to meet the geotechnical needs of the project as determined by GRI’s site observations. The OSU-Cascades campus can take the spoils from this undocumented fill if it would benefit the contractor. To the extent it is found to be cost effective, under GRIs direction, the undocumented fill could be sorted/screened/crushed to achieve a balanced site. • Contractor will excavate, place rock and compact the site in preparation for the modular building stem wall foundation and interior concrete block and beams (stem wall and concrete block and beams constructed by Willscot)...