Specifications include, but are not limited to: This request is for the removal and replacement of the existing Aaon units at The Ozark Community center, and replacement of similar units. All bids should include necessary duct connections, crane fees, electrical connections, curb adapters, start-up, etc. to make a functional system. Bids should be provided in the following format: Replacement of the following RTU Units at The Ozark Community Center - RTU1 (5 Ton Unit); RTU2(5 Ton Unit); RTU3(5 Ton Unit); RTU4(2 Ton Unit); RTU9(15 Ton Unit); RTU10(25 Ton Unit); Installation of Honeywell or similar building automation system to include a central controller, router, graphics, co2 sensors, temp sensors, current sensors, and occupancy sensor for all building HVAC units including MUA and dehumidification equipment. New wiring must be provided, installation, engineered control drawings, and integration to future and existing equipment to be included. City of Ozark should be provided with admin access to any building automation system installed...