Specifications include, but are not limited to: The CM@Risk will provide the following pre-construction design services that may include, but are not limited to the following: A. Key project personnel shall attend regular meetings with the Riverside Elementary School District #2 and the Orcutt/Winslow Architects to review project status, review design and update the construction cost estimate. B. Consult with the RESD and Orcutt/Winslow Architects regarding site use and improvements, phasing of the various projects, selection of materials, building systems and requirements. Firm shall make suggestions on which systems are most cost-effective. C. Conduct value engineering including estimates of alternative designs, procedures or materials, preliminary budgets and possible economies. D. Prepare and periodically update a preliminary project schedule for the Orcutt/Winslow Architects review and the RESD’s approval. At a minimum, this schedule shall be updated on a monthly basis. E. The firm shall coordinate and integrate the preliminary project schedule with the services and activities of the RESD, Orcutt/Winslow Architects and CM@Risk. As the design proceeds, the preliminary project schedule shall be updated (at a minimum on a monthly basis) to indicate proposed activity sequences and duration, milestone dates for receipt and approval of pertinent information, and submittal of the Guaranteed Maximum Price (GMP) proposal.