The Contractor shall furnish and install the ASCT system, including necessary travel time software, video detection equipment, licensing, servers, and performance reporting capabilities, to be integrated at all signalized intersections on existing City infrastructure along the study corridor based on detailed plans and technical specifications. 3.1.1. There are 28 Intersections involved in this project located in 2 Study Corridors. 3.1.1.1. The Deer Valley Road / Lake Pleasant Parkway intersection is listed in both study corridors and intersects one another. 3.2. The Contractor shall furnish and install the Project components in accordance with the requirements set forth in this document. 3.3. The Contractor shall install all hardware and/or software required to render the system fully operational.