Specifications include, but are not limited to: I-5: Marquam Bridge - SW Terwilliger Blvd Section of the Pacific Highway (Rt. No. I5) in Portland. FAP No. S001(540). ($ 2,000,000 - $ 5,000,000). Req. approx. 4,130 ft2, temp. signs, 12 ea. seq. arr. signs; 27 ea. PCMS; 690 hr flaggers; 90 ea. TCS; 880 ft temp. barr.; 2,700 yd2 comp. eros. blank.; 297.3 ton contam. soil disp.; const. surv. work; 253 yd3 gen. exc.; 150 ton agg. base; 100 ton ACP; 288 ft conc. barr.; switching, conduit, wiring; 3 ea. electrical systems install; telecom. material & install.; 55 yd3 sign sup. ftgs.; 190 ft sign sup. drilled shaft fnd.; 99,700 lbs truss sign br.; 2,710 lbs vert. sign mounts on extg. str.; 0.56 ac. perm. seeding. Completion Time: December 4, 2025. Class of Work: Signing.