Specifications include, but are not limited to: Remove & replace the existing concrete sidewalk and curb with new 4" Concrete Sidewalk & Integral Vertical Curb as identified in Exhibit B. Contractor to demo and dispose of existing flagpole. New sidewalk and curb to be formed and poured to replicate the existing footprint except for the flagpole base pad peninsula. See Exhibit B o Concrete to be 4000 P.S.I. with reinforcement as needed. o Install concrete over compacted minus stone. o Standard broom finish to be applied. o The work shall include saw cutting, expansion joints, excavation, backfilling, and compaction as needed to maintain concrete longevity. The work consists of furnishing all labor, materials, equipment, and services necessary to complete the removal and replacement of concrete sidewalk, curbs and/or alternates. Contractor to provide all pedestrian control and safety barricades during construction. All construction debris and concrete to be removed from the site and disposed of properly by the contractor. This is a turnkey project all necessary trades need to be included. All County permits are to be obtained by contractor and paid by the County. Only St. Charles County permits are needed.