Specifications include, but are not limited to: Remove and dispose of existing block stairs and any foundation or supporting structures, including the existing railing. All construction debris will be placed in a contractor supplied dumpster and should be hauled offsite and disposed of properly. Protect existing concrete slab, fences, and gates (to remain in place). Full scope of work is included in the Civil Construction Drawings, as listed below, prepared by SWT Design on page C-001 under “NOTES.” All County permits are to be obtained by contractor and paid by the County. Only St. Charles County permits are needed. Alternate #1: Supply and install a 1.90" outside diameter stainless steel grasping rail as identified in attached drawings page C-300. Grasping rail should be painted with two coats of DTM Semi-Gloss Black Paint.