Specifications include, but are not limited to: 1. Readiness Center Building: (i) Interior work includes a total gut and reconfiguration of the men’s and women’s restrooms and showers, kitchen and scullery including removal and replacement of the interior floor slab. For the remainder of the building, offices and classrooms will receive new interior finishes, doors, ceilings, operable partition, new HVAC and lighting. 1. Some portions of the commercial kitchen equipment are identified as bid Alternate No. 1. (ii) Exterior work includes a new membrane roof, EIFS repairs and replacement, replacement of the sectional overhead door, pedestrian door and windows. (iii) Replacement of the main entrance with a bullet resistant unit is identified as bid Alternate No. 4. 2. Cold Storage Building work includes removal of PEMB exterior metal siding, repairs to damaged structure, installation of new metal siding, the addition of insulation to underside of the existing roof, and replacement of sectional overhead and pedestrian doors. All work associated with Cold Storage Building is part of bid Alternate No. 2. The Base Bid excludes all work. 3. Old FMS Building includes removal and replacement of interior finishes in the office, restroom and two storage rooms. The large vehicle storage bays will be power washed. Existing LED light fixtures will be reused. All work associated with Old FMS Building is part of bid Alternate No. 3. The Base Bid excludes all work. 4. Site work includes replacement and addition of paving, drives, sidewalks, and fencing.