Specifications include, but are not limited to: The Booker Avenue Drainage Basin – Combined Sewer Separation project consists of: DIVISION 1: Stormwater and Sanitary Sewer: The Booker Avenue Drainage Basin Combined Sewer Separation Division 1 Project work includes 106 linear feet of 6-inch sanitary sewer, 780 linear feet of 8-inch sanitary sewer, 416 linear feet of 18-inch sanitary sewer and 9 sanitary sewer manholes, 1,150 linear feet of 18-inch storm pipe, 1,102 linear feet of 24-inch storm pipe, 497 linear feet of 30-inch storm pipe, 560 linear feet of 42-inch storm pipe, and 27 storm structures, connections to existing structures, site restoration and all other incidental work. DIVISION 2: Cured-in-place pipe (CIPP): The Booker Avenue Drainage Basin Combined Sewer Separation Division 2 Project work includes 238 linear feet of 36-inch CIPP liner, 662 linear feet of 42-inch CIPP liner and 918 linear feet of 48-inch CIPP liner for existing reinforced concrete stormwater pipe, televising and cleaning of existing reinforced concrete pipe and all other incidental work.