Specifications include, but are not limited to: Annual maintenance Service and Load Testing of the Backup Generator(s) - Contractor shall furnish all labor, material, and equipment to provide scheduled maintenance service and load testing for emergency generator(s) as follows: a. Load Bank Test: Contractor shall perform a resistive load bank test at 100% load for the specified duration of two (2) hours. b. Full Service: Contractor’s service visit shall include the changing of crankcase oil, lube filers, fuel filters, water filters and all other service checks listed in the Generation Maintenance Guidelines. c. Annual maintenance, load testing, and inspection services (Full Service) to be completed by December 31 of each year. Additional Service/Repairs/Inspection - a. Upon request by Agency for additional service/repairs/inspection, Contractor shall submit an estimate to the OSP Facilities Coordinator. b. Upon verbal or written approval from the OSP Facility Coordinator (or delegate), Contractor shall provide all labor, materials, freight, and equipment to perform requested additional repairs.