Specifications include, but are not limited to: The project consists of replacing the existing 8-inch culinary transmission pipeline along State Highway 6 and the Price River from Royal to just north of Helper City by installing approximately 19,200 feet of 10-inch HDPE pipe and installing approximately 1,780 feet of 10-inch HDPE pipe to replace the existing 4-inch pipe from the Colton well to the connection at the Spring Canyon Springs transmission pipeline. This will include installing valves, fittings, drain lines, and air valves; excavation; backfilling; surface restoration; erosion and sediment control; and disinfection. Pipeline replacement will include one UDOT crossing at Hwy 191 and one crossing of the Union Pacific Railroad. Additionally, there will be construction of an interconnection between the Helper City and Price City waterlines at Royal. New meters will also be installed at Colton and Royal.