Specifications include, but are not limited to: This project will replace existing commercial vehicle guide signs to provide a consistent format across the state. All work is anticipated to be performed within the existing right-of-way and utility relocations are not anticipated. The consultant will be expected to hold progress meetings, as necessary, to ensure the project is on schedule and the team is resolving project issues. Survey efforts will be limited to new sign locations. Utility designation will not be required. A Geotechnical Investigation and Materials Design Report will NOT be prepared for this project. The consultant will be required to provide documentation and support to ADOT staff in securing the necessary environmental, utility, and Right of Way clearances for the project. Design submittals are expected for Stage III, Stage IV, and PS&E.