Specifications include, but are not limited to: Section: 0001 - ROADWAY LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT 0010 00001 DGA BASE 800.00 TON $ 0020 00100 ASPHALT SEAL AGGREGATE 235.00 TON $ 0030 00103 ASPHALT SEAL COAT 33.00 TON $ 0040 00190 LEVELING & WEDGING PG64-22 1,067.00 TON $ 0050 00272 CL2 ASPH BIND 0.50D PG64-22 4,502.00 TON $ 0060 00301 CL2 ASPH SURF 0.38D PG64-22 8,762.00 TON $ 0070 00462 CULVERT PIPE-18 IN 60.00 LF $ 0080 01310 REMOVE PIPE 50.00 LF $ 0090 02483 CHANNEL LINING CLASS II 10.00 TON $ 0100 02562 TEMPORARY SIGNS 1,467.00 SQFT $ 0110 02650 MAINTAIN & CONTROL TRAFFIC (KY 1297) 1.00 LS $ 0120 02650 MAINTAIN & CONTROL TRAFFIC (KY 2326) 1.00 LS $ 0130 02650 MAINTAIN & CONTROL TRAFFIC (KY 2631) 1.00 LS $ 0140 02650 MAINTAIN & CONTROL TRAFFIC (KY 526) 1.00 LS $ 0150 02650 MAINTAIN & CONTROL TRAFFIC (KY 626) 1.00 LS $ 0160 02650 MAINTAIN & CONTROL TRAFFIC (KY 961 000-004) 1.00 LS $ 0170 02650 MAINTAIN & CONTROL TRAFFIC (KY 961 003-009) 1.00 LS $ 0180 02676 MOBILIZATION FOR MILL & TEXT (KY 1297) 1.00 LS $ 0190 02676 MOBILIZATION FOR MILL & TEXT (KY 2326) 1.00 LS $ 0200 02676 MOBILIZATION FOR MILL & TEXT (KY 2631) 1.00 LS $ 0210 02676 MOBILIZATION FOR MILL & TEXT (KY 526) 1.00 LS $ 0220 02676 MOBILIZATION FOR MILL & TEXT (KY 626) 1.00 LS $ 0230 02676 MOBILIZATION FOR MILL & TEXT (KY 961 000-004) 1.00 LS $ 0240 02676 MOBILIZATION FOR MILL & TEXT (KY 961 003-009) 1.00 LS $ 0250 02677 ASPHALT PAVE MILLING & TEXTURING 4,790.00 TON $ 0260 02697 EDGELINE RUMBLE STRIPS 11,616.00 LF $ 0270 03240 BASE FAILURE REPAIR 2,055.00 SQYD $ 0280 06510 PAVE STRIPING-TEMP PAINT-4 IN 128,460.00 LF $ 0290 06514 PAVE STRIPING-PERM PAINT-4 IN 170,123.00 LF $ 0300 06568 PAVE MARKING-THERMO STOP BAR-24IN 197.00 LF $ 0310 10020NS FUEL ADJUSTMENT 22,165.00 DOLL $1.00 $ $22,165.00 0320 10030NS ASPHALT ADJUSTMENT 55,668.00 DOLL $1.00 $ $55,668.00 0330 21553EN EMBANKMENT 72.00 CUYD $ 0340 22664EN WATER BLASTING EXISTING STRIPE 600.00 LF $ 0350 22950NN PAVE MARKING-THERMO STOP 1.00 EACH $ 0360 24970EC ASPHALT MATERIAL FOR TACK NONTRACKING 78.00 TON $