Specifications include, but are not limited to: 1. Provide and maintain Temporary Work Zone Traffic Control. 2. Complete 2” Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified Asphalt Tack Coat, furnish and repave with 2” of Level 2, ½” Dense ACP, full width. 3. Work on Bridge 01097A a. Perform Bridge Deck Cold Plane Pavement Removal, 2.5” deep. b. Perform Bonded Membrane Removal. c. Place 1” ACP Base Course, rolled waterproof membrane, and 2” ACP wearing course. d. Extend waterproof membrane 5 feet beyond the bridge deck onto the approach slab. 4. Work on Bridge 00953A a. Perform Bridge Deck Cold Plane Pavement Removal, 3” deep. b. Perform Bonded Membrane Removal. c. Place 1” ACP Base Course, rolled waterproof membrane, and 2” ACP wearing course. 5. Perform additional and incidental work as called for by the plans and specifications.