Specifications include, but are not limited to: 1. Design Phase: a. Conduct detailed site investigations, including topographic surveys, geotechnical analysis, hydrological studies, and hydraulic studies. b. Assess existing drainage conditions and identify areas prone to flooding. c. Review the Hohokam Area Drainage Master Study Phase I Study Report, Hohokam Area Drainage Master Plan Level 3 - Recommended Plan Report Executive Summary, and Hohokam Area Drainage Master Plan Level 3 - Recommended Plan Report as they relate to these specific locations to validate or update findings based on existing site conditions. d. Develop preliminary design concepts and alternatives for stormwater management. e. Prepare detailed engineering designs for storm drain systems, detention basins, and related infrastructure. f. Develop construction plans, specifications, and cost estimates. g. Provide design submittals and drainage reports at the 30%, 60%, 90%, and 100% completion stages, followed by a sealed final submittal. h. Coordinate with relevant stakeholders, including City departments, utilities, and the public, to ensure comprehensive design solutions. i. Secure necessary permits and approvals from regulatory agencies. 2. Right of Way Services: a. Identify necessary and alternative right of way for project implementation. b. Prepare necessary documents such as legal description, easement, area calculations and map exhibit. 3. Public Outreach: a. Develop and implement a public outreach plan to inform and engage the community about the project. b. Organize public meetings, workshops, and informational sessions to gather feedback and address concerns. c. Provide regular updates to the public and maintain open lines of communication throughout the project duration...