Project includes removal of existing entrance station and placing new entrance station building and parking improvements at various locations throughout Snow Canyon State Park. Mobilization/Demobilization. Field Surveying and Staking. Traffic Control. 3” Thick Asphalt Pavement over 8" Thick Untreated Base Course. Gravel Parking Lots. Curb & Gutter. Concrete Curb (Entrance Station). Mountable Curb and Gutter. Concrete Parking Blocks. Pavement Striping. Bollards. Signage. Silt Tortoise Fence. Drainage Ditch. Pressure Treated Wood Stairs. Earthwork, GeoCell Fabric, Topsoil, and Reseeding. Earthwork and Reseeding. Riprap Stabilization with Geotextile Fabric. Entrance Station – Raise. Water Valve Can. Rail Wood Signature Fence. Entrance Station. Retaining Block Wall. Speed Hump. 18" CMP Culvert Installed. 18" CMP End Sections. Concrete Pipe Collar. Raise Manhole Cover. Entrance Station Riprap Stabilization with Geotextile Fabric. Excavate Soft Spots and Re-compact with Import Fill. Welded Steel Fence. Remove Catch Basin. Concrete Island. Existing Entrance Station Demolition