The Contractor is responsible for all storms forecast to have accumulations of 2” or more. Plowing is to be started within one (1) hour after the accumulation is equal to or greater than two inches (2”); or in the case of a forecasted storm of 2” or greater where actual accumulation falls less than 2”, then plowing shall commence no later than one (1) hour after completion of the storm. The Contractor shall have licensed drivers who perform winter maintenance Salting and sanding is to be accomplished by the Town outside of this contract. The Highway Division of Public Works shall be notified by the Contractor when material application is needed (Highway phone number is 423-8551). During weekdays and at times when Town Business is in session, contractors will be required to plow access roads, aisles between parked cars, etc. to facilitate vehicular movement. It is expected that the bulk of the plowing will need to be scheduled when the staff and visitors have vacated the parking areas. Every effort shall be taken to ensure that all designated areas are free from snow, ice, and are sanded and salted before 8:00 am each day.