The intent of this project is to replace the existing 17,000 Sift. (approximate, contractor to verify area) of shingled roof with a metal panel roofing system. A. Furnish and install concealed clip metal panel roofing system, including but not limited to: 1. All work to comply with roofing manufacturer’s requirements for the specified warranty. 2. Preparation of roofing substrates, including complete tear off of shingles, edge metal, fascia, etc. Wood nailers for roofing attachment. 3. Damaged or rotting R-20 Ventilated Nailable insulation replacement – As approved by the engineer. 4. Self-adhering underlayment. 5. Metal roof edging and coping. 6. Furnish and install metal roof vents. Color to match metal roof panels. 7. Flashings 8. Remove existing Solar Panel mounting bolts and weather seal penetrations. 9. Other roofing-related items specified or indicated on drawings or otherwise necessary to provide a complete roofing system. 10. Furnish and install Non-Penetrative Snow guard system around entire perimeter of roof. 11. Furnish and install all other work and materials considered to be normal and required by the roof material manufacturer for the roofing system specified.