Specifications include, but are not limited to: Asbestos Abatement in flooring at both Station #2 and #3 1. Removal, abate and disposal of floor tile materials. 2. Supply and install new materials a. Remove/Abate everything in affected area of flooring tiles. All employees should be certified. b. Install new resilient flooring and new vinyl base in abated areas. c. Clean up entire work area (all tiles and other materials). Demolition 1. Remove ceiling tile in engine bay of Station #3 2. Install Acoustic Ceiling replacement. 3. Clean up entire work area (all ceiling tiles and other materials). Finishes 1. Install new Armstrong 672 kitchen zone ceiling tile w/clips in #3 Engine Bay. 2. Install (9) new operable windows. Clear andozied frames with 1” gray solarban 60 glass. 3. Clean up entire work area and dispose of all other materials...