The Contractor will responsible for Sawing cut concrete from the driveway to the electric department building beside the meter base. The Contractor will be responsible for installing 3 phase 200-amp automatic transfer switch beside the meter base. The Contractor will be responsible for installing conduit and wire from the meter base to the new switch, then to existing main service inside. Conduit from the transfer switch will be installed to the new generator location underground 60 feet. The Contractor will be responsible for pulling 100-amp circuit to the generator and terminate, pull control wire in separate conduit and terminate. Contractor will install a ground rod and connect to the main panel at the Annex Building. A 400-amp transfer switch will be installed where the existing meter base is on the Annex Building.