Specifications include, but are not limited to: Furnish all labor, materials, and equipment necessary to: 1. Demolish the existing caustic and magnesium chloride storage tanks and associated instrumentation. Remove and salvage existing caustic and magnesium chloride pumps and associated piping as shown on the contract documents. 2. Demolish the Profibus conductors associated with the improvements and restore the Profibus ring to service for existing Struvite Recovery Facility equipment that is not associated with the improvements. 3. Install new caustic and magnesium chloride storage tanks, chemical pumps, and piping and connect to new tanks and existing piping. 4. Decommission existing valve vaults, grade and pave new chemical tank area, install new equipment door to the building, and install new safety eyewash and shower. 5. Install new electrical and instrumentation associated with these improvements.