The Contractor's Scope of Work shall include, but is not limited to, all materials, labor, supervision, hoisting, expediting, equipment, erection, shoring, scaffolds, tools, and all other items required to furnish and install a complete concrete job. This may include but is not limited to the demolition of old concrete. The type of work that may be performed will be site work, including the construction of everything outside of the building footprint. Typical items considered as site work are sidewalks, handicap ramps, trash enclosures, drive approaches, curb and gutter, transformer pads, and light pole bases. Additionally, furnishing and installation of all cast-in-place concrete work including, but not limited to, footings, foundations, concrete columns, concrete beams, thickened edges, concrete pads, thickened slabs, concrete pilasters, concrete polishing, site work, grading, subgrade work, shotcrete, compressible fillers, joint sealants, housekeeping pads, PCC pavement, slab-on-grade, concrete over metal deck, elevated concrete slabs, Styrofoam, concrete ramps, reinforcing steel, dowels, and epoxy, grout (including structural steel base plates and elevator sills), concrete curing, formwork, chamfer strips, vapor barrier, crack joints, construction joints, expansion joints, and accessories. The Contractor shall perform all proposed pavement marking paint. The Contractor is responsible for any sheet piling that may be required to perform this scope of work.