A. Contractor shall mobilize to site and prepare site for job. B. Contractor shall lock out/tag out power to the unleaded fuel system. C. Contractor shall drain any remaining fuel in existing dispenser and dispose of according to all local and state regulations. D. Contractor shall remove and dispose of existing dispenser according to all local, state and federal regulations. E. Contractor shall provide and install one (1) new Tuthill FR702VRU, or equivalent cabinet fuel dispenser. F. Contractor shall re-plumb the new dispenser. G. Contractor shall commission the new dispenser. H. Contractor shall leave copies of owner’s manual with onsite contact. I. Contractor shall check in and out at the office each workday. J. Contractor shall clean all debris and dispose of properly at the end of each workday. K. Contractor shall complete job within thirty (30) days of startup.