The PROJECT comprises: 1. The construction of roughly 5,111 feet of drinking water pipelines to replace existing aging pipe in the 10200 South area, including 10200 South from Bangerter Highway to 3200 West, Chattel Circle, 3265 West from approximately 9924 South to 10000 South, and 3345 West from 10000 South to 10200 South. 2. The construction of approximately 2700 feet of drinking water pipeline to replace existing aging pipe in 1055 West. The project also includes replacing copper and galvanized water service lines (including meter boxes) with poly-pipe, furnishing and installing fittings, fire hydrants, connection materials, and miscellaneous appurtenances. Upon completion of the waterlines, the roads will require a road treatment.