Specifications include, but are not limited to: 1. Concrete bulbouts, striping, sandblasting existing crosswalk, and new ADA ramp for a new crosswalk near Mapleton Junior High on 1200 N and 200 East. 2. Installation of new ADA ramps in locations where they are missing which includes all related concrete work, detectable warning pads, and curb/gutter. 3. Installation of new ADA ramps to replace the existing non-compliant ADA ramp. In addition to the new ramps being installed, all old concrete from the existing ramp needs to be hauled off. 4. Installation of 2 new ADA ramps where sloped asphalt currently exists. In addition to new concrete ramps being installed, all old asphalt will need to be wrecked out and hauled off.