Specifications include, but are not limited to: Location of sediment to be removed and required access to project area is shown marked on attached plans (see Section M). o NOTE: Limited height access in culverts will be necessary. The City recommends a site visit to verify height for equipment access. o The lateral extent of sediment removal will be marked in the field by the City prior to work beginning. o Estimated sediment quantities to be removed are included in the bid table of Section C. Access to the project areas shall be established by the contractor, preferably with a rock path. o Please include cost estimates to remove the access path and for path to remain upon completion of the work. Sediment removed shall be disposed of at Metro Fill Development (2115 S. River Road, St. Charles, MO 63303) under current agreement with City. Contractor responsible for traffic control and street sweeping, as necessary or as directed by the City. Existing trail, retaining walls, pedestrian bridge, and fences shall be protected from damage. Contractor responsible to replace or repair any damages at the Contractor’s expense