Specifications include, but are not limited to: The Partnership seeks high-quality exterior painting services at the Facility (the “Services”). The Services shall include the following. • General prep work, to include: o Power-wash exterior prior to painting o Prep, scrape, and spot prime loose paint around exterior and all areas to be painted o Cover windows, sprinkler heads, and other items as needed around the Facility • Facility painting, to include: o Five bollards in the loading dock area o Two bollards, connected at the top (i.e., upside down U), on the west side of the Facility o The emergency exit landing and steps on the west side of the Facility with a more durable paint o Handrails and awning to match the existing handrails