Specifications include, but are not limited to: A. Provide Generator Preventive Maintenance and Load Testing Services that include, but are not limited to, the repairs, preventive maintenance, adjustments, emergency services, and inspection services for the six (6) emergency generators on the campus of Clifton T. Perkins Hospital Center and its surrounding buildings. All services requested by CTPHC and administered by the Contractor will adhere to applicable local, state, and federal code requirements. I. General Generator Preventive Maintenance and Load Testing Services for each CTPHC generator will consist of but is not limited to the following: a. The Contractor shall inspect all Fuel tanks and lines to determine the presence of excessive sludge or rust build up. All fuel filters shall be cleaned and replaced as required. i. A minimum of one (1) complete filter change is required per year. b. The Contractor shall perform inspections on the condition of batteries, battery chargers, generator battery chargers. i. The Contractor shall provide a report any action necessary for recharging or replacement of battery or charging equipment. c. The Contractor shall Inspect the air cleaner and change/replace air cleaner elements once a year. d. The Contractor shall inspect automatic transfer switches, meters, gauges, indicators and other integral instrumentation for proper operation. e. The Contractor shall inspect the cooling system for optimal levels and operation. i. The Contractor shall inspect and ensure that the antifreeze concentration for protection to – 50 degrees Fahrenheit and administer antifreeze to achieve optimal levels when necessary to maintain specified concentration f. The Contractor shall inspect the generator crankcase and ensure that the oil levels are maintained at an optimal level per manufacturer’s specifications. g. The Contractor shall inspect the condition of the generator drive belts, replace as needed and report any actions taken or required. h. Analysis and verification of generator fuel to be free of contaminants Biannually during the term of the contract. i. Lubricating fluid (oil) replacement annually. i. Performance of Lubricating fluid replacement is to be conducted at the start of the contract/service period. ii. If generators indicate a run or operation time that is fifty (50) hours or greater, additional lubricating fluid replacement shall be performed. j. Afte the completion of the inspection and maintenance tasks, the Contractor shall conduct operational tests to verify and ensure functionality of the generators...